113 Laurel Hill Pl., Murrells Inlet | The Preserve At Laurel Hill
Murrells Inlet, SC 29576
- 3Beds
- 2Full Baths
- N/AHalf Baths
- 1,714SqFt
- 2017Year Built
- 0.19Acres
- MLS# 2614294
- Residential
- Detached
- Pending
- Approx Time on Market1 month, 17 days
- AreaMyrtle Beach Area--South of 544 & West of 17 Bypass M.i. Horry County
- CountyHorry
- Subdivision The Preserve At Laurel Hill
Overview
Pristine and move-in ready with a stunning lake view! Welcome to this beautifully maintained 3-bedroom, 2-bath home in the perfectly-located Natural Gas Community the Preserve at Laurel Hill, nestled on the northern edge of Murrells Inlet. Designed for comfortable living and effortless entertaining, this home features a spacious split-bedroom floor plan, high ceilings, crown molding, neutral paint colors, and engineered hardwood flooring throughout the main living areas. This bright, open-concept layout seamlessly connects the living room, dining area, and kitchen, creating an inviting space with plenty of room for both everyday living and gatherings with family and friends. The spacious kitchen boasts granite countertops, a tile backsplash, stainless steel appliances, a gas range, walk-in pantry, and a large center island perfect for meal preparation and casual dining. Freshly steam-cleaned carpet in the bedrooms and tile flooring in the bathrooms add to the home`s immaculate condition. Privately situated at the rear of the home, the roomy primary suite enjoys peaceful lake views and features a large walk-in closet, dual vanities, and a walk-in shower. Two additional guest bedrooms are located on the opposite side of the home and share a full bath, providing comfort and privacy for family or visitors. Step outside to enjoy one of the home`s most appealing features—a large screened porch overlooking the tranquil lake. Beyond the porch, an elegant custom concrete patio offers additional outdoor living space ideal for grilling, entertaining, relaxing, or even adding a hot tub. Completing the home are a convenient laundry room and a spacious 2-car garage. Plus this home has a gas furnace perfect for winter cold snaps!!! If you`re looking for a move-in-ready home with beautiful water views, quality finishes, and a fantastic Murrells Inlet location, this one is not to be missed. The Preserve at Laurel Hill is perfectly located just off of McDowell Shortcut and is close to everything including medical, shopping, the Marsh Walk & Brookgreen Gardens. Don`t let this one get away! Book your showing today!!! Listing information is deemed reliable but not guaranteed. All measurements are approximate. Buyer is responsible for verification of all measurements and HOA info prior to closing.
Agriculture / Farm
Association Fees / Info
Hoa Frequency: Monthly
Hoa Fees: 66
Hoa: Yes
Hoa Includes: CommonAreas, Trash
Community Features: GolfCartsOk, LongTermRentalAllowed
Assoc Amenities: OwnerAllowedGolfCart, OwnerAllowedMotorcycle
Bathroom Info
Total Baths: 2.00
Fullbaths: 2
Room Dimensions
Bedroom2: 11.5 x 11
Bedroom3: 11.5 x 10.5
DiningRoom: 11 x 11
Kitchen: 13 x 11
LivingRoom: 12 x 12
PrimaryBedroom: 14.5 x 13
Room Level
Bedroom2: First
Bedroom3: First
PrimaryBedroom: First
Room Features
DiningRoom: LivingDiningRoom
Kitchen: Dishwasher, KitchenIsland, Pantry, StainlessSteelAppliances, SolidSurfaceCounters
Other: BedroomOnMainLevel, EntranceFoyer, UtilityRoom
PrimaryBathroom: DualSinks, SeparateShower
PrimaryBedroom: MainLevelPrimary, WalkInClosets
Bedroom Info
Beds: 3
Building Info
Levels: One
Year Built: 2017
Zoning: MRD2
Style: Traditional
Construction Materials: Masonry, VinylSiding, WoodFrame
Buyer Compensation
Exterior Features
Patio and Porch Features: RearPorch, Patio, Porch, Screened
Window Features: WindowTreatments
Foundation: Slab
Exterior Features: SprinklerIrrigation, Porch, Patio
Financial
Garage / Parking
Parking Capacity: 4
Garage: Yes
Parking Type: Attached, Garage, TwoCarGarage, GarageDoorOpener
Attached Garage: Yes
Garage Spaces: 2
Green / Env Info
Interior Features
Floor Cover: Tile, Wood
Laundry Features: WasherHookup
Furnished: Unfurnished
Interior Features: DualSinks, MainLevelPrimary, SeparateShower, WalkInClosets, WindowTreatments, BedroomOnMainLevel, EntranceFoyer, KitchenIsland, StainlessSteelAppliances, SolidSurfaceCounters
Appliances: Dishwasher, Disposal, Microwave, Range, Refrigerator, Dryer, Washer
Lot Info
Acres: 0.19
Lot Size: 62'x130'x62'x130'
Lot Description: LakeFront, PondOnLot, Rectangular, RectangularLot
Misc
Offer Compensation
Other School Info
Property Info
County: Horry
Stipulation of Sale: None
Property Sub Type Additional: Detached
Security Features: SmokeDetectors
Disclosures: CovenantsRestrictionsDisclosure,SellerDisclosure
Construction: Resale
Room Info
Sold Info
Sqft Info
Total Sqft: 2275
Living Area Source: PublicRecords
Sqft: 1714
Tax Info
Unit Info
Utilities / Hvac
Heating: Central, Electric, Gas
Cooling: CentralAir
Cooling: Yes
Utilities Available: CableAvailable, ElectricityAvailable, NaturalGasAvailable, Other, PhoneAvailable, SewerAvailable, UndergroundUtilities, WaterAvailable
Heating: Yes
Water Source: Public
Waterfront / Water
Waterfront: Yes
Waterfront Features: Pond
Schools
Elem: Saint James Elementary School
Middle: Saint James Middle School
High: Saint James High School
Directions
Use your GPS or: From Hwy 17 Bypass Southbound, turn right onto Tournament Blvd, then right onto McDowell Shortcut Rd. Take this about 1.5 miles until you get to Laurel Hill Pl. on the left. The house will be the 3rd one on the left. From Hwy 707 Northbound slight right onto McDowell Shortcut Rd. Continue straight through the light, continue straight until getting to Laurell Hill Place on the left. The house will be the 3rd on the left.Courtesy of Keller Williams Innovate South

MLS# 2617817
Provided courtesy of © Copyright 2026 Coastal Carolinas Multiple Listing Service, Inc.®. Information Deemed Reliable but Not Guaranteed. © Copyright 2026 Coastal Carolinas Multiple Listing Service, Inc.® MLS. All rights reserved. Information is provided exclusively for consumers’ personal, non-commercial use, that it may not be used for any purpose other than to identify prospective properties consumers may be interested in purchasing.
Images related to data from the MLS is the sole property of the MLS and not the responsibility of the owner of this website. MLS IDX data last updated on 07-22-2026 6:33 AM EST.
Any images related to data from the MLS is the sole property of the MLS and not the responsibility of the owner of this website.